Crews on call 24/7 across Metro Vancouver Emergency? Get a callback

Structural drying in Vancouver & the Lower Mainland

Removing the water is only half the job. We dry walls, floors and subfloors with commercial dehumidifiers and air movers — and measure moisture every day until materials are truly dry.

  • Available 24/7, 365 days
  • Free assessment
  • One team, start to finish

Surfaces can feel dry while the framing, subfloor and drywall behind them are still wet. Moisture left inside the structure leads to warped floors, swollen trim, musty smells and mould weeks later.

Our drying is driven by measurements, not guesswork. We map where the moisture is, set up the right equipment, and only pull it once readings show the materials have reached their drying goal.

Structural Drying

What we dry

  • Drywall & wall cavities

    Cavity drying lets us save walls without opening them up where possible.

  • Hardwood & laminate

    Drying mats and targeted airflow to limit cupping and buckling.

  • Subfloors & concrete

    Wet slabs and plywood subfloors dried from above and below.

  • Cabinets & built-ins

    Toe-kick removal and injection drying behind cabinets.

  • Crawl spaces

    Damp, hard-to-reach spaces dried and ventilated.

  • Contents

    Furniture and belongings moved, blocked up or dried on site.

Our process

How our drying works

  1. 1

    Moisture mapping

    Moisture meters and thermal imaging show exactly how far the water travelled — including behind walls.

  2. 2

    Drying plan

    We size the dehumidifiers and air movers to the space, materials and amount of water.

  3. 3

    Equipment set-up

    Equipment is placed for even airflow; containment speeds drying in targeted areas.

  4. 4

    Daily monitoring

    We return to take readings, adjust equipment and keep you updated.

  5. 5

    Dry standard confirmed

    Equipment comes out only when readings match unaffected materials in your home.

FAQ

Structural drying questions

How long does drying take?

Most jobs take 3–5 days. Larger losses, dense materials like hardwood and concrete, or water that sat for a long time can take longer. Daily readings tell us when it's done.

Can I turn off the equipment at night?

Please don't. Drying works around the clock, and turning equipment off can add days to the job and increase the risk of mould.

Will the equipment raise my power bill?

It uses electricity, typically a modest amount over a few days. We note the equipment and run time for your records.

Need structural drying now?

Serving Vancouver, Burnaby, Richmond, Surrey, North Vancouver, West Vancouver, New Westminster, Coquitlam, Port Coquitlam, Port Moody, Delta, Langley, Maple Ridge, Pitt Meadows, White Rock and Abbotsford.